Vaughan Constructions has completed another multi-level industrial facility, Platform, for Hale in Milperra, NSW.
This venture sees the completion of a circa 38,000m² multi-level warehouse that includes tenancies ranging from 2,900m² to 10,102m².
The facility features two floors of warehousing, four levels of office space, an external ramp to provide access to level one and 30-metre-wide breezeways on both levels for undercover loading areas.
The project includes a range of sustainability initiatives such as a PV solar system and rainwater harvesting and is targeting a 4 Star Green Star rating.